welcome button.gif (7916 bytes)contact button.gif (7684 bytes)rules button.gif (7415 bytes)
links button.gif (7154 bytes)
points button.gif (7643 bytes)pictures button.gif (8004 bytes)marshalling button.gif (8240 bytes)directions button.jpg (19404 bytes)sprint button.gif (1746 bytes)

 

 

 


             www.bumpsandjumpsrc.com

                    

Concrete getting ready to go into a footer, Notice the footer it will tie into, also the batter boards which establish the outside wall of the building and also the floor elevation.

                          \

Finally the East side of the building gets aproved by the building inpector to get poured.

 

                          

Footers don't appear to be that hard to put in. Here the guys are just watching the concrete fall off the truck.

 

                            

More Crete going in a hole

 

                            

This is about the time concrete splashes into my eye, man that stings.