welcome button.gif (7916 bytes)contact button.gif (7684 bytes)rules button.gif (7415 bytes)
links button.gif (7154 bytes)
points button.gif (7643 bytes)pictures button.gif (8004 bytes)marshalling button.gif (8240 bytes)directions button.jpg (19404 bytes)sprint button.gif (1746 bytes)

 

 

 


             www.bumpsandjumpsrc.com

       

The guys got a lot done this week. This is the back of the building.

 

This is a picture of the back and side of the building.

A front view. I also ran the conduit and temporary wire to the lights and hung a unit heater this weekend.

 

They are attaching a piece of angle to the concrete so they have something to screw the side panels too.



The men that get to do all the work. Phil, Randy, Elvin, and Jeremy